Temporary Lane Closures for Sign Installation from February 15 through February 20, 2023
FOR IMMEDIATE RELEASE
February 13, 2023
Temporary Lane Closures for Sign Installation from February 15 through February 20, 2023
(WASHINGTON, DC) — The District Department of Transportation (DDOT) will be conducting a series of LED flashing chevron alignment sign Installations on westbound and east bound on I-695 at 11th Street Bridge on the District’s highway network from Wednesday, February 15 to Monday, February 20, 2023. These activities will require single and/or multiple lane closures and take place during off-peak hours between 10:00 p.m. to 5:00 a.m., weather permitting.
The required lane closures and installation activities are scheduled to occur as follows:
Install six Chevron Alignment signs (W1-8) sequentially spaced at 120ft intervals on I-695 westbound on the existing barrier.
Wednesday, February 15, 2023
There will be a right lane closure.
Monday, February 20, 2023 (Rain Date)
There will be a right lane closure.
Install five Chevron Alignment signs (W1-8) sequentially spaced at 120ft intervals on I-695 eastbound on the existing barrier00
Thursday, February 16, 2023
There will be a left lane closure.
Friday, February 17, 2023 (Rain Date)
There will be a left lane closure.
On any day which on-site conditions prohibit closures in the areas noted above, the daily activities will be completed the following day when conditions permit.
Traffic controls will be in place to warn motorists as they approach the areas.
Motorists are advised to stay alert while traveling through these locations and to be observant of the installation personnel.